Use this page to configure script-execution blackout periods for Monitoring Console.
For each listed blackout period, the details page displays the following information:
Column | Description |
---|---|
Blackout Period Name | Name defined for the blackout period. For example, Two-Hour Duration Test, One-Day Interval. |
Time Type | For the dates given in the schedule of the blackout period, two different time type options are available:
|
Start Time | Time at which the blackout period is to become active. |
Duration | Length of time that projects are to be disabled while a blackout is active. |
Interval | Interval at which the blackout periods should reoccur. The amount of time that is to transpire between blackouts. Active
intervals for blackout periods exclude the start time, but include the end time.
Note: Blackout periods cannot overlap.
Monitoring Console will not allow you to define overlapping blackout periods.
|
Scheduled Until | Time at which the blackout period is to end. If the specified Duration would call for a blackout to remain active once the Scheduled Until time is reached, all associated projects remain disabled until the Duration has ended. |
Blackout Type | Determines how associated projects are disabled. There are two types of disablement:
|
Projects |
|